Azernews.Az

Tuesday March 19 2024

Drilling of next well on Gunashli field completed

16 May 2017 16:33 (UTC+04:00)
Drilling of next well on Gunashli field completed

By Laman Ismayilova

SOCAR-AQS has completed the works on construction of well 31 on the Guneshli field from stationary platform 11, with target depth of 4,075 m, successfully, without any incidents and without harming the environment.

The Customer of drilling works is Azneft Production Unit.

SOCAR-AQS LLC was established as an integrated drilling and well services management company between the State Oil Company of Azerbaijan Republic and Absheron Drilling Company in 2007. Main scope of activities of the company is provision of work and services related with drilling of oil and gas wells, including: well design and planning; drilling of oil and gas wells; drilling of directionally deviated wells; drilling of horizontal wells; well completion; well workover; sidetracking and drilling of multilateral wells.

The company now implements works on drilling the wells from fixed platforms 7 and 11 located on Shallow Water Gunashli Field, fixed platform 20 on the West Absheron fixed platform 1 located on Umid Field and from fixed platform 6 located on the Bulla Field.
The company is a contractor member of IADC since 2009. SOCAR-AQS has been assessed and certified as meeting the requirements of ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 international standards for Provision of Integrated Offshore Oil & Gas Drilling and Well Services; Casing Running Services and BOP and Wellhead Equipment Repairing and Testing Services.

SOCAR-AQS is conducting the work on obtaining, in the near future, of the certificate based on the requirements of API Spec Q2.

---

Follow us on Twitter @AzerNewsAz

Slider Image 1
Slider Image 1
Drilling of next well on Gunashli field completed - Gallery Image
Drilling of next well on Gunashli field completed - Gallery Image
Loading...
Latest See more