By Trend
During January-September 2018, Azerigaz laid 2385.1 kilometers
of new gas pipelines, and for the safe operation of the gas
pipeline network overhauled 182.6 km of the existing lines,
Azerigaz said in a message on Oct. 09.
As a result of the construction and assembling work, during
January-September 2018, 71 settlements have been provided with gas
in Agstafa, Agjabadi, Agsu, Ismayilli, Barda, Gakh, Guba, Shabran,
Shamakhi, Shaki, Goychay, Goygol, Ujar, Khachmaz, Beylagan,
Yevlakh, Lerik, Lankaran, Sabirabad, Saatli, Salyan, Neftchala,
Jalilabad and Masalli districts.
---
Follow us on Twitter @AzerNewsAz