Greece keen on 'South Corridor' energy strategy
ATHENS – Greece has reiterated its support for the European
Union's 'South Corridor' strategy, which stipulates the
transportation of the Caspian natural gas to the European markets
via the Balkans and Italy.
Greece advocates the diverse energy and transit routes, which are
vital to enhancing both European and its own energy security, Greek
Minister of Environment and Energy, Tina Birbili was quoted by
Trend as saying.
The construction of adequate energy infrastructure and the upgrade
of the existing one are important to the effectiveness of the
'South Corridor' energy strategy, the Greek minister added.
She said her country is striving for the soonest completion of the
Greece-Bulgaria section of the ITGI project.
According to her, the IGB is to be commissioned by 2013, while the
continental section of the Greece-Italy and the offshore Poseidon
pipelines - by 2015.
"The EU is considering the ITGI as a priority project for the
development of the Southern Corridor strategy and will be
contributing a fifth of the Poseidon pipeline and a third of the
IGB costs, which amount to 100mln and 45mln euros respectively,"
Birbili said.
ITGI pipeline, one of the key projects of the 'South Corridor'
strategy, stipulates supplies of the Azeri gas to Greece and Italy.
ITGI includes a modernized Turkish pipeline, as well as two other
projects: ITG (connecting pipeline Turkey-Greece) and IGI
(Greece-Italy), known as Poseidon.
The capacity of the planned sub-sea pipeline, Poseidon, is 8-10bn
cubic meters of gas a year. The pipeline with a length of 212
kilometers will run along the Adriatic sea-bed, from the Greek
Stavrolimenasa to Italian Otranto. Italian company Edison is in
charge of construction of the pipeline, which is to be completed by
2012.
The ITGI pipeline capacity is planed to make up 11.8bn cubic meters
of gas a year.
Greece will receive 3.6bn cubic meters of gas, and the rest -
Italy. ITGI pipeline will run from Azerbaijan through existing gas
pipeline Baku-Tbilisi-Erzurum to Georgia and Turkey, and further to
Greece and Italy. The pipeline is scheduled for commissioning in
2015.
Here we are to serve you with news right now. It does not cost much, but worth your attention.
Choose to support open, independent, quality journalism and subscribe on a monthly basis.
By subscribing to our online newspaper, you can have full digital access to all news, analysis, and much more.
You can also follow AzerNEWS on Twitter @AzerNewsAz or Facebook @AzerNewsNewspaper
Thank you!