TAP construction in Albania launched
The construction of the Trans Adriatic Pipeline (TAP) has started in Albania, TAP reported on September 30.
The occasion was marked by an inauguration ceremony near the
town of Fier, attended by the Prime Minister of Albania, Edi Rama,
Minister of Energy and Industry, Damian Gjiknuri, and TAP Managing
Director, Ian Bradshaw.
Speaking to the audience that included representatives of the local
authorities and other key stakeholders, Prime Minister Rama and
Energy Minister Gjiknuri emphasised the importance of the project
to Albania.
As one of the largest foreign investments in the country, TAP will
have a positive impact on the country’s energy sector and will help
encourage other foreign investments, they said.
“TAP has made huge progress over these last few years and the
evidence is what you see here today: steel pipes on the ground,
heavy machinery in the background, trenches dug waiting for pipe to
be laid. All this, with many hundreds of thousands of safe hours
worked,” said TAP Managing Director Ian Bradshaw.
TAP project envisages transportation of gas from the Stage 2 of
development of Azerbaijan's Shah Deniz gas and condensate field to
the EU countries.
The 870-kilometer pipeline will be connected to the Trans Anatolian
Pipeline (TANAP) on the Turkish-Greek border, run through Greece,
Albania and the Adriatic Sea, before coming ashore in Italy's
south.
TAP’s route through Albania will be approximately 215 kilometres
onshore and 37 km offshore in the Albanian section of the Adriatic
Sea.
---
Follow us on Twitter @AzerNewsAz
Here we are to serve you with news right now. It does not cost much, but worth your attention.
Choose to support open, independent, quality journalism and subscribe on a monthly basis.
By subscribing to our online newspaper, you can have full digital access to all news, analysis, and much more.
You can also follow AzerNEWS on Twitter @AzerNewsAz or Facebook @AzerNewsNewspaper
Thank you!