Kazakhstan seeks to reduce oil output
Oil production in Kazakhstan will amount to 77 million tons in
2016, Kazakhstan’s Energy Minister Vladimir Shkolnik said, IA
Novosti-Kazakhstan reported on January 15.
Speaking at the press conference, Shkolnik said that 79.46 million
tons of oil was produced, while the initial plan was 79 million
tons.
"We plan to produce some 77 million tons of oil this year," he
said, adding that work is underway to increase this figure.
"We will launch the Kashagan project this year, and it will start
from the next year to give its contribution to overall oil
production,” he added.
According to his calculations, Kashagan will first produce seven
million tons, then rising up to 11 million tons next year and
further to 13 million tons.
The geological reserves of Kashagan are estimated at 4.8 billion
metric tons of oil. The total oil reserves amount to 38 billion
barrels; some 10 billion out of them are recoverable reserves.
There are large natural gas reserves at the Kashagan field - over
one trillion cubic meters.
The production at the Kashagan field started September 2013, but in
October, it was ceased after a gas leak in one of the main
pipelines. The analysis revealed numerous cracks in the pipeline,
which needed to be completely replaced.
The project’s operator, the North Caspian Operating Co. (NCOC)
confirmed the need for a complete replacement of the gas and oil
pipelines, which have a total length of about 200 kilometers.
The production at the Kashagan is expected to resume in late 2016.
---
Follow us on Twitter @AzerNewsAz
Here we are to serve you with news right now. It does not cost much, but worth your attention.
Choose to support open, independent, quality journalism and subscribe on a monthly basis.
By subscribing to our online newspaper, you can have full digital access to all news, analysis, and much more.
You can also follow AzerNEWS on Twitter @AzerNewsAz or Facebook @AzerNewsNewspaper
Thank you!