Kazakhstan increases capacity of its major oil pipeline
Kazakhstan completed the overhaul of its section of Tuimazy-Omsk-Novosibirsk-2 (TON-2) oil pipeline which allowed to increase its capacity from 7 to 10 million tons of oil per year, KazTransOil company reported.
The pipeline section 185.6 km long was replaced within the overhaul work.
The overhaul of TON-2 was conducted to ensure the reliable oil
transportation through Kazakhstani section of TON-2 pipeline to
Pavlodar Petrochemical Plant and Russian oil transit to China.
The project cost over 32 billion tenges (341.06 tenge = $1).
--
Follow us on Twitter @AzerNewsAz
Here we are to serve you with news right now. It does not cost much, but worth your attention.
Choose to support open, independent, quality journalism and subscribe on a monthly basis.
By subscribing to our online newspaper, you can have full digital access to all news, analysis, and much more.
You can also follow AzerNEWS on Twitter @AzerNewsAz or Facebook @AzerNewsNewspaper
Thank you!