Minister: TAP received necessary permits in Italy
By Trend
All necessary permits have been received for construction of the Trans Adriatic Pipeline (TAP) in Italy, said the country’s Minister for Territorial Cohesion and South, Claudio De Vincenti.
“No backtrack on the implementation of TAP: the authorization has been issued and the work must go on,” Italian media quoted the minister as saying.
He also emphasized the opportunity which can be opened up for the region with the construction of TAP, Italian media reported.
Earlier, Lisa Givert, head of communications at TAP, told Trend that that the project’s implementation will have a minimal impact on Italy’s environment, moreover, planting of olive trees along the gas pipeline’s route will continue.
TAP is a part of the Southern Gas Corridor which is one of the priority energy projects for the European Union.
TAP project envisages transportation of gas from the Stage 2 of
development of Azerbaijan's Shah Deniz gas and condensate field to
the EU countries.
The pipeline will be connected to the Trans Anatolian Natural Gas
Pipeline (TANAP) on the Turkish-Greek border, run through Greece,
Albania and the Adriatic Sea, before coming ashore in Italy's
south.
TAP will be 878 kilometers in length (Greece 550 km, Albania 215
km, Adriatic Sea 105 km, and Italy 8 km). Its highest point will be
1,800 meters in Albania’s mountains, while its lowest point will be
820 meters beneath the sea.
---
Follow us on Twitter @AzerNewsAz
Here we are to serve you with news right now. It does not cost much, but worth your attention.
Choose to support open, independent, quality journalism and subscribe on a monthly basis.
By subscribing to our online newspaper, you can have full digital access to all news, analysis, and much more.
You can also follow AzerNEWS on Twitter @AzerNewsAz or Facebook @AzerNewsNewspaper
Thank you!